1
/ 4
7Goldsworthy UL Lounge 2017FEB05 001
Stage 3 of the remodel was to install the air cell insulation, as witnessed by the blue coloured walls.
Stage 3 of the remodel was to install the air cell insulation, as witnessed by the blue coloured walls.